Backfilling, lather, rinse, repeat

With part I poured and waterproofed it’s time to do some backfilling. But first…

We were in NYC when they began backfilling and one of our visits was to Scholastic where we saw this floor that we liked. I’m not sure my sweetie will let me do a Clifford rug on the walls though.

B800BackfillLRR 1269

 

Just prior to backfilling it looked like:

B800BackfillLRR 0005

On to backfilling

B800BackfillLRR 1283

 

Looking NW. Footings for sauna/conservatory (foreground), SW corner of basement, and retaining walls for the terrace. Remember that many of these go 5’ below what you see here.

B800BackfillLRR 1284

 

We can drive in to our garage now.

B800BackfillLRR 1285

Looking SE towards conservatory.

B800BackfillLRR 1288

Sewer connection.

B800BackfillLRR 1293

 

Old furnace that is likely from the house that was here just prior to ours that was built in 1972.

B800BackfillLRR 1296

 

Racks of forms ready for creating more walls.

B800BackfillLRR 1

B800BackfillLRR 4

 

Lather, rinse, repeat…  The lower of two terrace walls.

B800BackfillLRR 1328

B800BackfillLRR 1329

Oops. But only a little.

B800BackfillLRR 1336

 

Wall forms are kind of like a giant lego kit.

B800BackfillLRR 1339

B800BackfillLRR 1348

 

Two types of corner forms, one an inch longer than the other.

B800BackfillLRR 3635

B800BackfillLRR 3637

 

Da boss checking the plans. Sand makes a good paperweight.

B800BackfillLRR 3643

B800BackfillLRR 3649

 

This will be the terrace once it’s filled in.
B800BackfillLRR 3656

Good view of what was done during the first pour and what they’re forming for the second (and final).

B800BackfillLRR 0006